TO THE MINNESOTA POLLUTION CONTROL AGENCY,

As a Minnesotan for Line 3, I ask that you approve the permits needed for Enbridge’s Line 3 Replacement Pipeline Project. The facts, data, and other information from the review process clearly support the permits for this project. Line 3 is important and will benefit Minnesota, because::

  • Replacing aging infrastructure with a state-of-the-art pipeline is the best option for protecting Minnesota’s environment and pristine natural resources.
  • There are new proposed environmental protections, such returning filtered water that was used for testing back to appropriate water bodies and implementing an air quality emissions limit.
  • 99.98% of the wetland impacts during construction are temporary and they will be restored.
  • Line 3 is the most studied pipeline in Minnesota history and will be replaced with the most advanced materials and technology available.
  • Line 3 will generate outstanding economic benefits for the state and demonstrate our economic and environmental leadership.
  • Replacing Line 3 is required to meet the energy needs of Minnesota and neighboring states.

It’s Time to Build Line 3!

I’m a Minnesotan for Line 3.
Let’s move forward with 2020 construction

  • This field is for validation purposes and should be left unchanged.